XINGYU VIET NAM Safety Protection Technology Project

The XINGYU VIETNAM Safety Protection Technology Project, invested by Xingyu Group (Singapore) with a total capital of nearly USD 84.5 million, has officially broken ground at Bao Minh Expanded Industrial Park, Nam Dinh Province.

Bao Tin Steel is honored to be selected as a key partner for this project, supplying steel materials and accessories that help ensure construction quality and maintain progress on this strategic development.

Introduction to the XINGYU VIETNAM Safety Protection Technology Project

The XINGYU VIETNAM Safety Protection Technology Project is a large-scale Foreign Direct Investment (FDI) project developed by Xingyu Group (Singapore). Construction officially commenced at Bao Minh Expanded Industrial Park, Vu Ban District, Nam Dinh Province.

With a total investment of nearly USD 84.5 million, the project covers an area of over 103,500 m². The factory is designed to produce:

  • 300 million pairs of protective work gloves per year

  • 10 million pairs of medical gloves per year

Once operational by December 2025, the plant is expected to play a vital role in the global and domestic supply chains of high-quality safety protection products.

Dự án Kỹ thuật Bảo hộ An toàn XINGYU VIỆT NAM
XINGYU VIETNAM Safety Protection Technology Project

Project Overview

Project Name: XINGYU VIETNAM Safety Protection Technology Project
Investor: Xingyu Group (Singapore)
Location: Bao Minh Expanded Industrial Park, Vu Ban District, Nam Dinh Province
Total Investment: Nearly USD 84.5 million (over VND 2,000 billion)
Land Area: Over 103,500 m²

Designed Capacity:

  • 300 million pairs of protective work gloves/year (approx. 1,950 tons)

  • 10 million pairs of medical gloves/year (approx. 300 tons)

Project Duration: Until December 30, 2060
Expected Operation Date: December 2025

This project marks a significant milestone in attracting FDI to Nam Dinh Province and contributes to advancing Vietnam’s labor safety equipment manufacturing industry toward modernization and international standards.

Upon completion, the factory is expected to create thousands of jobs while strengthening the supply of high-quality protective products for both domestic consumption and export markets, supporting sustainable regional economic growth

Materials Supplied by Bao Tin Steel

As a trusted supplier selected by the investor, Bao Tin Steel provided a comprehensive range of high-quality construction materials, primarily imported galvanized steel pipes, along with essential piping accessories, including elbows, tees, reducers, and related components.

More than 17,900 meters of galvanized steel pipes in various specifications were delivered to the project site, including:

Ống thép mạ kẽm nhập khẩu Thép Bảo Tín cấp cho dự án XINGYU
Imported Galvanized Steel Pipes supplied by Bao Tin Steel for the XINGYU Project

Detailed Specifications of Galvanized Steel Pipes:

  • Galvanized Pipe: 59.9 x 3.6mm
  • Galvanized Pipe: 113.5 x 4.5mm
  • Galvanized Pipe: 33.5 x 3.2mm
  • Galvanized Pipe: 88.3 x 4mm
  • Galvanized Pipe: 168.3 x 5.16mm
  • …..

In June 2025, Bao Tin Steel completed the delivery of all materials to the construction site. Despite a tight schedule, every stage—from quality inspection and loading to transportation and unloading—was carefully managed and strictly controlled.

As a result, the materials were highly appreciated by the investor for both quality and aesthetic appearance, ensuring full compliance with project requirements.

Successfully meeting the project’s strict standards for both delivery timeline and product quality once again demonstrates Bao Tin Steel’s strong execution capabilities and reaffirms the investor’s confidence in selecting Bao Tin Steel as a strategic supplier.

Challenges Faced by Bao Tin Steel

Supplying materials for a project of this scale posed several challenges, including:

  • Large Material Volume: The project required a massive quantity of steel pipes, fittings, and industrial components within a limited timeframe, demanding strong inventory capacity and effective warehouse management.
  • Tight Construction Schedule: Strict delivery deadlines had to be met to avoid delays to on-site construction activities.
  • High Technical Standards: All products were required to meet stringent quality standards, be accompanied by full CO–CQ documentation, and pass on-site inspections.
  • Logistics and Coordination Pressure: Transportation and delivery within fixed time windows required close coordination among logistics, warehouse, and sales teams.

Despite these challenges, Bao Tin Steel successfully fulfilled all requirements and received high recognition from the investor—an achievement that reflects our professionalism and commitment to excellence.

Images of XINGYU VIETNAM Safety Protection Technology Project

Below are some images from the construction site:

Dự án Kỹ thuật Bảo hộ An toàn XINGYU VIỆT NAM

Ống thép mạ kẽm nhập khẩu được Thép bảo Tín cung cấp

Ống thép mạ kẽm nhập khẩu được Thép bảo Tín cung cấp

Ống thép mạ kẽm nhập khẩu được Thép bảo Tín cung cấp

Ống thép mạ kẽm nhập khẩu được Thép bảo Tín cung cấp

Ống thép mạ kẽm nhập khẩu được Thép bảo Tín cung cấp

👉👉Explore other projects by Bao Tin Steel:

  • BYD Electronics (Vietnam) Plant Project
  • Win Lock 2B Industrial Development Project

Commitment to Sustainable Partnerships

Participating in the XINGYU VIETNAM project is both an honor and an opportunity for Bao Tin Steel to demonstrate its flexibility, reliability, and dedication to world-class industrial construction.

Every delivery represents not only materials but also our commitment to quality, precision, and long-term partnership.

Bao Tin Steel remains committed to being a trusted supplier, offering comprehensive material solutions for industrial projects, factories, and infrastructure developments nationwide.

📞 Contact us today for a detailed consultation and competitive quotations.
Hotline: (+84) 932 059 176