The project to build a new Thu Duc Regional General Hospital was started at 64 Le Van Chi, Linh Trung Ward, Thu Duc City.
It is expected that after completion, the new Thu Duc Regional General Hospital will have a scale of 1 basement, 10 floors, and a height of 46.7 m.
The total construction floor area is 78,281 m2, the total investment is 1,915 billion VND, the technical infrastructure meets 1,000 beds and the scale of inpatient care is 500 modern beds.
The project is divided into 2 construction phases, each phase has 500 beds and other ancillary works.
See more projects:
Bao Tin Steel is honoured to be included in the category of supplying materials to construct the fire protection system for the entire project.
Main products included:
➡️Galvanized steel pipe: DN25 ~ DN300
➡️Industrial valve products
➡️Specialized fire protection equipment
➡️Steel pipe fittings
Bao Tin Steel would like to thank the Management Board of Investment and Construction Projects for Civil and Industrial Works for approving the Capacity Profile of Bao Tin Steel.
Below are some pictures of delivery at the construction site.



