Van Phong 1 BOT Thermal Power Plant Project

️SUPER PROJECT BOT VAN PHONG 1 THERMAL POWER PLANT WITH TOTAL INVESTMENT OF 2.6 BILLION USD️

The Van Phong 1 BOT Thermal Power Plant projects (Ninh Hoa town, Khanh Hoa) started construction in 2019 and has reached about 65% progress, expected to be put into commercial operation in 2023.

Bao Tin Steel is honoured to be the supplier of steel pipes, flanges, valve accessories, elbows, tees, etc. for the project.

Once operational, the plant is expected to supply the national grid with approximately 9 billion kWh per year. This electricity will be transmitted via the 500 kV Van Phong – Vinh Tan line.

Ống thép cấp cho Dự án nhà máy nhiệt điện BOT Vân Phong 1
Steel pipes supplied to Van Phong 1 BOT Thermal Power Plant Project
Phụ kiện ống thép cấp cho Dự án nhà máy nhiệt điện BOT Vân Phong 1
Steel pipe accessories supplied to Van Phong 1 BOT Thermal Power Plant Projects